Details
City: Punta Cana - Bavaro, Bavaro
Commodities
Access to electricity and drinking water, Social Area, Elevator, Balcony, Cistern, Electricity 24 hours, Gazebo, Electric Power Plant, Electric Gate, Pre-installation A/C, Gated Community, Security 24 hours
Description
Commercial Plaza Project – Punta Cana
This project consists of a mixed-use commercial plaza with 3 levels, strategically located along Avenida Boulevard Turístico del Este in Punta Cana, offering easy access to numerous tourist destinations and high visibility.
Project Description
1st Level – Restaurants & Retail Stores
- 17 commercial units starting from 50.83 m²
- 2 units with private terraces
- 2 modular pop-up stores
- 13 storage spaces for additional inventory or goods (total storage area: 90.13 m²)
2nd Level – Retail Stores
- 18 commercial units starting from 50.83 m²
3rd Level – Executive & Corporate Offices
- 18 office units starting from 40 m²
- 2 offices with terraces
- Rooftop terrace area: 457.60 m²
In total:
53 commercial and office units, 2 modular pop-up stores, and 13 storage spaces.
Amenities
- Common areas
- Backup power generator
- Spacious parking areas
- Restrooms
- Elevator
- Stairways
- Lockers
- Open rooftop terrace with pergola
- Reinforced concrete structure
- Permanent water supply
- Reliable electrical system
- Sanitary system
Finishes & Construction Details
Interior Floors:
- Delivered in shell condition (gray work), no interior flooring included.
Exterior Floors & Hallways:
- Finished with large-format porcelain tiles and coral stone flooring.
Doors:
- Main doors in floating glass; curtain walls with glass panels.
Windows:
- Sliding glass windows in the 3rd-level units.
Walls:
- Smooth finish with white acrylic paint on interior walls.
Façade:
- Front, side, and rear façades finished with textured acrylic paint and glass railings along corridors.
Common Area Restrooms:
- Fully waterproofed and tiled for durability and hygiene.
Payment Plan
- Reservation: US$ 2,000
- Upon Agreement Signing: 20%
- During Construction: 30%
- Upon Delivery: 50%
Delivery Date
January 2027
Contact Information