House / Villa en venta in Buena Vista, Jarabacoa

Reference #46284

Sale: US$ 220,000

Details

City: Jarabacoa, Buena Vista

Province: La Vega

Bedooms: 3

Bathrooms: 2

Visiting baths: 1

Parking: 6

Built Surface: 160 m2

Lot Surface: 400 m2

Status: In construction

Construction year: 2025

Delivery month: October

Commodities

Access to electricity and drinking water, Air Conditioning, Laundry Area, Social Area, Balcony, Dining Room, Electricity 24 hours, Jacuzzi, Garden, Kitchen Cabinets, Patio, Electric Gate, Pre-installation A/C, Gated Community, Security 24 hours, Terrace, Walk In Closet

Description

The Exceptional Villas Project in Jarabacoa captures the beauty and tranquility of one of the most charming destinations in the Dominican Republic. This project is more than just a place to live; it is an authentic and sophisticated life experience. The villas have been designed with meticulous attention to every detail, blending modern style with natural elements that seamlessly integrate with the surroundings.

7 minutes from the center of Jarabacoa, Buena Vista

Location:

2 minutes from center of Jarabacoa , Dominican Republic

2 minutes from Jarabacoa Paintball Club

 3 minutes from Plaza Alterra

5 minutes from Downtown Jarabacoa

6 minutes from the Jimenoa River

7 minutes from Jarabacoa Golf Club

11 minutes from Ribera Country Club

1 hour and 54 minutes from Santo Domingo

Villa Features:

All plots approximately 400 m2 and villas 160 m2 of construction.

Living Room, 

Dining Room,

Kitchen

1/2 Bathroom

Carport for 4 Vehicles

Laundry Area

Staircase

Covered Terrace

Patio

Bedroom Distribution:

 

Ground Floor:

3 bedrooms, main with W/C and Bathroom

Each bedroom with balcony

2 bathrooms

Finishes and Amenities:

 

✅ Imported ceramic floors

✅ Precious Wood Cabinets

✅ Granite countertops

✅ Windows in water-resistant framework

✅ Precious Wood Staircase

✅ Precious Wood Ceilings

Services and Amenities:

Security checkpoint

Clubhouse

Payment Conditions:

Reservation with only US$1,000.00

10% Initial, upon signing the contract

30% during construction

Delivery Date: Scheduled for September 2025

Request more Information

Complete the following form and we will contact you as soon as possible. Make sure that your contact information is correct.